Weekly Update 2

During the second week of excavation we reached the bottom of LCG2′ s central corridor, which arrives at a meter and a half wide at the base of the perimetral wall. The main discovery was the identification of a clay floor that allowed the passage inside the tomb without trampling the depositions, made by cutting […]